Module 7 Set-1

ALL THE BEST

 

Results

WOW!! YOU PASSED THE TEST!!

CONGRATULATIONS 

 

Will you do a favour for me by clicking on any ads…

SORRY PRACTICE AGAIN!!

 

Will you do a favour for me by clicking on any ads…

#1. WEIGHT AND BALANCE IS CARRIED OUT ACCORDING TO _________________

#2. MTCS FOR EWIS ___________

#3. SMALL ORGANISATION MEANS __________

#4. IN WHICH WELDING, NON CONSUMABLE ELECTRIDE IS NOT USED ________

#5. WHEN MAINTENANCE IS CARRIED OUT __________–




#6. HORIZONTAL DIST FROM FULCRUM IS __________

#7. THE EFFECTIVE WAY FOR DETECTING SURFACE OR SUB- SURFACE CORROSION IS __________

#8. TOW BARS IS SUBJECTED TO WHICH STRESS ?

#9. WHICH CONTAINS SPECIAL INSPECTION PROCEDURE –

#10. FLUX USED FOR _________________________




#11. PROTECTION OF EMI/ HIRF

#12. WHICH SOLVENT IS USED FOR CLEANING OF RUBBER PART AND ACRYLICS _______

#13. ELECTROMAGNETIC WAVES ____________

#14. WROUGHT AL AND WROUGHT AL ALLOY ARE DESIGNATED BY __________

#15. AFTER INSTALLATION CHAIN SHOULD BE CHECKED FOR ___________




#16. GUST WIND CAUSE ______________

#17. HUMAN FACTOR

#18. MTCS

#19. ATA CHAPTER

#20. WRINKLES ON WING _______________




#21. HIGH TEMP SOLDERS USED IN__________

#22. GROWLER TESTER IS USED FOR _____________-

#23. FOR RECTANGULAR CONDUCTORS CROSS SECTIONAL AREA OF CONDUCTOR MEASURED IN ________

#24. VERNIER SCALE POSITION ____________

#25. MTCS ABOUT TITLE BLOCKS –




#26. MAXIMUM LANDING WEIGHT __________

#27. 2117-T4 AL ALLOY, 5056 AL ALLOY MONEL ARE __________

#28. FOR LOOSENING STRAIGHT PIN, TAPER PIN RIVET _________

#29. IN ORTHOGRAPHIC, HOW MANY VIEWS ARE POSSIBLE ____________

#30. MTCS ABOUT ISOMETRIC DRAWING –




#31. MTCS ABOUT FAIRLEAD __________

#32. WEIGHT AND BALANCE OF AN A/C IS GIVEN IN WHICH MANUAL ?

#33. EDDY CURRENT IS ________________

#34. WHEN REPLACING COPPER WIRE WITH ALUMINIUM ___________

#35. MTCS ABOUT RADIOGRAPHIC INSPECTION —




#36. ALTERNATE LONG AND SHORT DASH INDICATES ___________

#37. MAX AND MIN OF BASIC SIZE _________

#38. INSPECTION IS CARRIED OUT ACC TO ____________-

#39. BASIC WEATHER RADAR ANTENNA REFLECT WAVE WHEN WAVE STRIKING ?

#40. OXY-ACETYLENE IS NOT USED FOR WELDING ON _______________




#41. A SOLID CONDUCTOR WITH METAL BRAIDS OUTSIDE IS CALLED ______________

#42. AS PER SAFETY AND QUALITY PURPOSE WHICH MINIMUM MUST BE IN ___________

#43. PIN IS CUSTOMARY INSTALLED WITH HEAD UP SO THAT IF COTTOR PIN FAILS OR WORKS OUT, THE PIN WILL REMAIN IN —

#44. ALODIZING IS DONE ON ___________

#45. THE ANGLE OF FLUTE IN RELATION TO THE WORK IN DRILLING OPERATION _________




#46. FILES ARE GRADED IN ____________

#47. MTCS

#48. MPI, MTCS

#49. MTCS BEARING SUPPORTS :

#50. AIRFRAME STRUCTURE OR ENGINE INSPECTED BY —




#51. 7.533+ 0.0075 – 0.0003 , MTCS –

#52. ADF WORKING RANGE ___________

#53. MTCS ABOUT JACKING

#54. WHICH OF THE FOLLOWING ARE CLOSELY ASSOCIATED _______

#55. WHEN LIGHTENING STRIKE ON A/C __________




#56. MTCS

#57. HACKSAW BLADES ARE CLASSIFIED AS –

#58. DURING FUELING OPERATION, HOW MUCH TIME YOU MUST TAKE IN MOBILE REFULER

#59. SLACK IN FLEXIBLE HOSE ____________

#60. MTCS




#61. 2117T RIVET ARE USED IN STRUCTURAL PART OF __________-

#62. PINNING OF FILE _____________

#63. A/C GYROSCOPE POWER SHOULD BE TURNED OFF, BEFORE REMOVAL OF COMPONENT –

#64. CAPE CHISEL MTCS –

#65. LIGHTENING HOLES ARE CUT IN RIB SECTION, FUSELAGE FRAME AND OTHER STRUCTURAL PART ___________




#66. SHORT DASHES EVEVLY SPACED – DASH LINE IS ALSO KNOW AS _________

#67. DURING ERROSION OF COMPOSITE IS RESULT OF ___________-

#68. PLIER USED FOR CRIMPPING WIRE –

#69. MTCS ABOUT BONDING

#70. AN -380___________




#71. MTCS – HARD LANDING

#72. WING RIGGING CHECKS INCLUDES _____________-

#73. CORRECT SENTANCE REGARDING LATHE MACHINE OPERATION

#74. ___________ IS HORIZONTAL DIST, THAT A PART OF THE A/C OR EQUIPMENT IS LOCATED FROM THE DATUM

#75. ALLOY OF METAL WHICH HAVING LOW MELTING TEMP..




#76. THE PROCESS OF HEATING THE STEEL ABOVE CRITICAL RANGE, HOLDING IT AT THAT POINT AND THEN COOLING IN SLOWLY, THE PROCESS IS CALLED ___________

#77. WHEN ADDING WEIGHT IN A/C AFT DATUM _____________

#78. IN ENGINE STARTING, IT TURNS OFF ALL AVOINIC EQUIPMENT DUE TO _________

#79. IN RIGID TUBING INSTALLATION __________

#80. MTCS




Previous
Finish

1 thought on “Module 7 Set-1”

Leave a Comment