Module 7 Sep Session 2026 | AMP Paper

module 7a

1. Drill material Cobalt. 2. Red line Arrowhead. 3. “Tack cards” The handwritten term/answer is unclear. 4. Reusable fitting Nut, sleeve, nipple. 5. Additive manufacturing NOT (option 1), as marked in the notes. 6. Hydraulic inspection All. 7. Crimping installation Options noted: (1) prior to installation, (2) after installation, (3) no need. The selected answer … Read more

Module 7 Regular Session 2 of 2026 | June Session

Note – These Questions written based on memory, Please refer reference Books Module 7 regular session 2 of 2026 B2 Wiring Schematic diagram Schematic only for troubleshooting  With identification and location  All Before fuel sampling for fuel vehicle must be in rest for before water testing  A) 15 minutes  B) 30 minutes  C) 45 minutes … Read more

Module 7A Session 3 of 2025 Questions

module 7a

Module 7 B1 (session 3 OF 2025) 1. A1xxx  pure aluminium  2. Keet saw   3. Cold rivet xxx   4. Wirring diagram   5. Dye pene   6. Dye pene  7. Max empty fuel wt   8. No of log book   9. Crimping   10. CCl4   11. Fire AB C   12. Rivet Pitch min and average   13. Bearing excessive clearance   … Read more