Module 7 Set-1

ALL THE BEST

 

Results

WOW!! YOU PASSED THE TEST!!

CONGRATULATIONS 

 

Will you do a favour for me by clicking on any ads…

SORRY PRACTICE AGAIN!!

 

Will you do a favour for me by clicking on any ads…

#1. WHICH CONTAINS SPECIAL INSPECTION PROCEDURE –

#2. ATA CHAPTER

#3. A/C GYROSCOPE POWER SHOULD BE TURNED OFF, BEFORE REMOVAL OF COMPONENT –

#4. LIGHTENING HOLES ARE CUT IN RIB SECTION, FUSELAGE FRAME AND OTHER STRUCTURAL PART ___________

#5. 2117-T4 AL ALLOY, 5056 AL ALLOY MONEL ARE __________




#6. FOR RECTANGULAR CONDUCTORS CROSS SECTIONAL AREA OF CONDUCTOR MEASURED IN ________

#7. MTCS FOR EWIS ___________

#8. ALLOY OF METAL WHICH HAVING LOW MELTING TEMP..

#9. HORIZONTAL DIST FROM FULCRUM IS __________

#10. A SOLID CONDUCTOR WITH METAL BRAIDS OUTSIDE IS CALLED ______________




#11. ___________ IS HORIZONTAL DIST, THAT A PART OF THE A/C OR EQUIPMENT IS LOCATED FROM THE DATUM

#12. WING RIGGING CHECKS INCLUDES _____________-

#13. WHEN MAINTENANCE IS CARRIED OUT __________–

#14. MTCS

#15. WHICH OF THE FOLLOWING ARE CLOSELY ASSOCIATED _______




#16. MAX AND MIN OF BASIC SIZE _________

#17. VERNIER SCALE POSITION ____________

#18. MTCS

#19. MTCS ABOUT TITLE BLOCKS –

#20. ALTERNATE LONG AND SHORT DASH INDICATES ___________




#21. HACKSAW BLADES ARE CLASSIFIED AS –

#22. MTCS – HARD LANDING

#23. MTCS

#24. THE EFFECTIVE WAY FOR DETECTING SURFACE OR SUB- SURFACE CORROSION IS __________

#25. IN RIGID TUBING INSTALLATION __________




#26. HUMAN FACTOR

#27. WEIGHT AND BALANCE IS CARRIED OUT ACCORDING TO _________________

#28. PROTECTION OF EMI/ HIRF

#29. MTCS

#30. FOR LOOSENING STRAIGHT PIN, TAPER PIN RIVET _________




#31. ALODIZING IS DONE ON ___________

#32. 7.533+ 0.0075 – 0.0003 , MTCS –

#33. SHORT DASHES EVEVLY SPACED – DASH LINE IS ALSO KNOW AS _________

#34. MTCS ABOUT RADIOGRAPHIC INSPECTION —

#35. AS PER SAFETY AND QUALITY PURPOSE WHICH MINIMUM MUST BE IN ___________




#36. MTCS ABOUT JACKING

#37. DURING ERROSION OF COMPOSITE IS RESULT OF ___________-

#38. INSPECTION IS CARRIED OUT ACC TO ____________-

#39. THE ANGLE OF FLUTE IN RELATION TO THE WORK IN DRILLING OPERATION _________

#40. DURING FUELING OPERATION, HOW MUCH TIME YOU MUST TAKE IN MOBILE REFULER




#41. ELECTROMAGNETIC WAVES ____________

#42. TOW BARS IS SUBJECTED TO WHICH STRESS ?

#43. CAPE CHISEL MTCS –

#44. MAXIMUM LANDING WEIGHT __________

#45. AIRFRAME STRUCTURE OR ENGINE INSPECTED BY —




#46. WHEN LIGHTENING STRIKE ON A/C __________

#47. CORRECT SENTANCE REGARDING LATHE MACHINE OPERATION

#48. PIN IS CUSTOMARY INSTALLED WITH HEAD UP SO THAT IF COTTOR PIN FAILS OR WORKS OUT, THE PIN WILL REMAIN IN —

#49. WHEN REPLACING COPPER WIRE WITH ALUMINIUM ___________

#50. PINNING OF FILE _____________




#51. MTCS BEARING SUPPORTS :

#52. 2117T RIVET ARE USED IN STRUCTURAL PART OF __________-

#53. ADF WORKING RANGE ___________

#54. FLUX USED FOR _________________________

#55. IN ENGINE STARTING, IT TURNS OFF ALL AVOINIC EQUIPMENT DUE TO _________




#56. WHEN ADDING WEIGHT IN A/C AFT DATUM _____________

#57. WROUGHT AL AND WROUGHT AL ALLOY ARE DESIGNATED BY __________

#58. WRINKLES ON WING _______________

#59. MTCS ABOUT ISOMETRIC DRAWING –

#60. IN WHICH WELDING, NON CONSUMABLE ELECTRIDE IS NOT USED ________




#61. IN ORTHOGRAPHIC, HOW MANY VIEWS ARE POSSIBLE ____________

#62. SMALL ORGANISATION MEANS __________

#63. EDDY CURRENT IS ________________

#64. OXY-ACETYLENE IS NOT USED FOR WELDING ON _______________

#65. MTCS




#66. MTCS ABOUT FAIRLEAD __________

#67. PLIER USED FOR CRIMPPING WIRE –

#68. WEIGHT AND BALANCE OF AN A/C IS GIVEN IN WHICH MANUAL ?

#69. WHICH SOLVENT IS USED FOR CLEANING OF RUBBER PART AND ACRYLICS _______

#70. HIGH TEMP SOLDERS USED IN__________




#71. GUST WIND CAUSE ______________

#72. GROWLER TESTER IS USED FOR _____________-

#73. THE PROCESS OF HEATING THE STEEL ABOVE CRITICAL RANGE, HOLDING IT AT THAT POINT AND THEN COOLING IN SLOWLY, THE PROCESS IS CALLED ___________

#74. BASIC WEATHER RADAR ANTENNA REFLECT WAVE WHEN WAVE STRIKING ?

#75. AFTER INSTALLATION CHAIN SHOULD BE CHECKED FOR ___________




#76. AN -380___________

#77. MTCS ABOUT BONDING

#78. SLACK IN FLEXIBLE HOSE ____________

#79. MPI, MTCS

#80. FILES ARE GRADED IN ____________




Previous
Finish

1 thought on “Module 7 Set-1”

Leave a Comment